Quantcast
Channel: Instrument Control (GPIB, Serial, VISA, IVI) topics
Viewing all articles
Browse latest Browse all 5565

How to tell that Resman and NiVisaServer Finished

$
0
0

 Is there a way to programmatically determine when Resman and NiVisaServer has finished running?

 

We are running application code on a Windows XP machine (“machine A”) with NI Visa 4.5.1 and NI VXI 3.5 with a VXI chassis connected via a MXI cable to a MXI PCI card in the PC. The application code is C in Visual Studios 2008.

Another Windows XP machine (“machine B”) connects to “machine A” and issues commands to instruments in theVXI chassis connected to “Machine A”. This of course requires that "machine A" has to start Resman and NiVisaServer

 

Our issue is that when we launch Resman and NiVisaServer with our program on “Machine A”, we have no way of knowing when the programs have successfully completed. This is a particular issue with NiVisaServer…there doesn’t seem to be much documentation on that application.

 

Any guidance/tips/advice is appreciated :smileyhappy:


Viewing all articles
Browse latest Browse all 5565

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>